| Sr. No. | Particulars | 20' | 40' |
|---|---|---|---|
| 1 | Stuffing | ||
| a) | On Wheel ( Manual On Wheel ( Mechanical - only 3 Ton FL) |
3500 4000 |
4500 5000 |
| b) | Chillies | 5000 | 6500 |
| c) | Unloading from truck stacking in Open yard stuffing into Container – Manual Unloading from truck stacking in Open yard stuffing into Container – Mechanical (Special Equipment if any Extra) Additional charges for Special type of cargo like Coconut Fibre / Coconut Pith / Cotton Bales |
3500 4500 2000 |
5000 5700 3000 |
| 2 | Storage Charges | ||
| a) | Covered Warehouse 1st to 5th Day 6th to 10th Day (Per Day) from 11th to 15th day (Per Day) from 16th to 30th day (Per Day) from 31st to 60th day (Per Day) from 61st day onwards |
500 600 800 1000 1200 1500 |
1000 1200 1600 2000 2400 3000 |
| 3 | Granite | ||
| a) | Unloading, stacking, Stuffing | 6500 | 8500 |
| b) | Storage charges 1st to 5th Day 6th to 10th Day (Per Day) from 11th to 15th day (Per Day) from 16th to 30th day (Per Day) from 31st to 60th day (Per Day) from 61st day onwards |
500 600 800 1000 1200 1500 |
1000 1200 1600 2000 2400 3000 |
| c) | Storage Open Yard - Break Bulk shipment (on Cargo not stuffed/shut out/ removed without stuffing) | Rs. 200 Per sqmt/per week, Min charges for 10 sqmt. | |
| d) | i) Shut Out cargo (In & Out) minimum 5 MT charges applicable ii) Storage charges |
Rs. 120 Per mt/per operation Rs. 45 Per mt/per day |
|
| e) | For Heavy cagoes like Machines etc. and high value cargo, chages will be extra | ||
| 4 | Self Sealing & Central Excise Containers | 20" | 40" |
| a) | i) On Wheel inspection ii) Ground Inspection |
1500 2500 |
2500 3500 |
| b) | Storage charges 1st to 5th Day 6th to 10th Day (Per Day) from 11th to 15th day (Per Day) from 16th to 30th day (Per Day) from 31st to 60th day (Per Day) from 61st day onwards |
500 600 800 1000 1200 1500 |
1000 1200 1600 2000 2400 3000 |
| 5 | Transport charges: Empty container Pick Up from liner empty depot within radius of 10KM of CFS, & movement of Laden container to Port ( Additional surcharge will be applicable on basis of type of cargo) Kattupalli/Ennor port Chennai Port |
8000 10000 |
10000 12000 |
| 6 | Other charges for Export Activity i) RFID charges ii) Samples Cover Charges iii) Weighment charges iv) Custom Seal Charges (OTL) v) Escort charges if utilised vi) Reach stacker charges if utilise |
250 300 250 50 1850 6000 |
250 300 350 50 3700 10000 |
Terms & conditions
- Any Local transportation, empty movement, Port movement shall be extra as applicable.
- Additional Handling shall be extra.
- Ground rent charges for Haz / Reefer / Haz / FR (within guage) shall be 2 times & for ODC / OT (Out Guage) / OOG shall be 2 times.
- PD account system is available for the clients for ease of transactions.
- All cheques / DD to be drawn in favour of “Supply Chain Logistics Private Limited” Payable at par at all branches.
- GST & other government levies shall be applicable at the prevailing rates at the time of billing.
- Shipping Line / CHA will required to pay custom OT, if applicable.
- A Penalty of Rs.5,000/- per instrument will be levied for dishonor of Cheques irrespective of the reason for dishonour. Customers are requested to take extreme care and responsibility to honour the cheques to avoid inconvenience.
- Prior to gate out of Cargo/Container, all CFS dues should be paid up front.
- The rates quoted above are considering normal destuffing only ( using forklift). Any odd shape / heavy items cargoes / open top container which required additional handling equipment like crane etc will be charged extra.
- Rates are subject to change without prior intimation.
- Lashing & chocking, dunnage etc would be extra if applicable.
| Sr. No. | Particulars | 20' | 40' |
|---|---|---|---|
| 1 | Import : Loaded delivery (General Container) Transport of Laden Containers from CCTL/CITPL/ Kattupali port to CFS, PNR Processing, Laden Containers, Lift Off, Inspection, Laden Lift On, Delivery Upto 23 MT Above 23 MT |
8400 8400 |
10950 10950 |
| 2 | Import : Destuff Delivery (General Container) Transport of Laden container from CCTL/CITPL/ Kattupali port to CFS, Lift off Laden, Inspection, De- stuffing, Loading of cargo, Lift on empty container Upto 23 MT Above 23 MT (Above 3 MT Forklift, any other equipment will be charged extra) |
10050 10050 |
13100 13100 |
| 3 | ODC, Flat Rack, Open Top Containers, Heavy Lift- terminal handling, Escort & Movement charges Moved on Normal Trailer (with in gauge) Loaded Out Destuff Out (Above 3 MT Forklift, any other equipment will be charged extra) |
10500 12563 |
13688 16375 |
| 4 | ODC, Flat Rack, Open Top Containers, Heavy Lift- terminal handling, Escort & Movement charges Moved on Semi Bed, Low Bed Trailer (Loaded Out) |
||
| a) | Handling Charges below 23MT Above 23 MT ODC, Flat Rack, Open Top Containers, Heavy Lift- terminal handling, Escort & Movement charges Moved on Semi Bed, Low Bed Trailer (Destuff Delivery) |
11500 11500 |
13750 13750 |
| b) | Handling Charges below 23MT Above 23 MT (Above 3 MT Forklift, any other equipment will be charged extra) |
14500 14500 |
16750 16750 |
| c) | Additional Transportation charges for Low Bed / Semi Bed Trailers (PNR, Po Escorting) i) Height up to 3.5’ above gauge and width up to 1’ out of gauge (up to 25 MT) ii) Height between 3.5’ and 5’ out of gauge and width between 1’ and 2’ out of gauge (up to 40 MT) iii) Height between 5’ and 6’ out of gauge and width between 2’ and 2.5’ out of gauge (up to 40 MT) |
22000 22000 25000 |
22000 22000 25000 |
| 5 | Laden Boxes Storage Charges Laden container Storage charges 1st to 3rd Day (including day of arrival) 4th to 7th day 8th to 10th day 11th to 13th day 14th to 16th Day 17th to 20th Day 21st to 30th Day 31st to 45th day 46th to 60th Day 61st to 75th Day 76th to 90th Day 91st to 120th Day 121st days onwards i) for all Reefer & Haz cargo Storage will be 2 times of Normal Tariff. ii) For all ODC cargo, charges would be 2 times of Normal tariff |
NIL 700 1200 1500 1750 2050 2250 2750 3500 4000 5000 6000 7000 |
NIL 1400 2400 3000 3500 4100 4500 5500 7000 8000 10000 12000 14000 |
OTHER ADDITIONAL CHARGES
| Sr. No. | Particulars | 20' | 40' |
| a) | Fuel Surcharge | 900 | 1400 |
| b) | Energy Surcharge | 600 | 1200 |
| c) | Risk Management Charges | 1200 | 1200 |
| d) | Documentation Charges | 500 | 500 |
| e) | Insurance charges | 250 | 500 |
| f) | RFID Charges | 250 | 250 |
| g) | OTL/Seal Charges | 50 | 50 |
| h) | Weighment | 250 | 350 |
| i) | Additional Movement Charges | 3350 | 4750 |
| j) | Empty container movement charges | 2500 | 5000 |
| k) | Survey Charges | 250 | 250 |
GENERAL CHARGES
| i) | Examination Charges above 25% | 1750 | 3000 |
| ii) | 100% Examination Charges | 3500 | 6000 |
| iii) | Auction Handling + Valuation & NOC | 8500 | 8500 |
| iv) | Reefer plugging (8HRS Shift) | 2000 | 2000 |
| v) | Reefer Monitoring (8HRS Shift) | 750 | 750 |
| vi) | Reefer PTI | 500 | 500 |
| vii) | Scanning | 1500 | 2000 |
| viii) | Empty LOLO (Per Move) | 300 | 600 |
| ix) | Laden Lift on (per move) | 750 | 1250 |
| x) | Laden Lift off (per move) | 750 | 1250 |
| xi) | Shifting within CFS | 1000 | 2000 |
| xii) | custom Escort Charges | 2000 | 2000 |
| xiii) | SSR Charges (Priority movement) | 2500 | 3500 |
| xiv) | Empty Storage charges per day | 100 | 200 |
| xv) | Samples Cover Charges | 300 | 300 |
| xvi) | Empty contaienr usage charges | 2000 | 3500 |
Terms & conditions
- Charges for 45 Feet containers will be 25% Extra on Tariff of 40" container.
- Additional charges will be levied for cargo requiring special services like dunnage, lashing, materials etc.
- A Penalty of Rs.5,000/- per instrument will be levied for dishonor of Cheques irrespective of the reason for dishonour. Customers are requested to take extreme care and responsibility to honour the cheques to avoid inconvenience.
- PD account system is available for the clients for ease of transactions.
- No free days for Emblock movement
- Prior to gate out of Cargo/Container, all CFS dues should be paid up front.
- All cheques / DD to be drawn in favour of “Supply Chain Logistics Private Limited” Payable at par at all branches.
- GST & other government levies shall be applicable at the prevailing rates at the time of billing.
- Additional Handling equipment usage charges would be charged extra
- No Gr. Rent free on Emblock movement / PN57 boxes.
-
Charges for Additional Equipment Hire (4 Hrs)
- 3 Ton Forklift - Rs 1500 Per container
- 5 Ton Forklift - Rs 2500 Per container
- 10 & 12 Ton forklift charges Rs. 5500 Per container
- 16 Ton forklift charges & Hydra Crane Rs. 7500 Per container
- Additional charges for Scrap container Loaded delivery 2500 Per Teus & for Destuff delivery 3500 would be charged.
- Charges for HAZ / Reefer cargo 25% extra on Handling & storage 2 times on General Tariff.
- Amendment charges Rs. 500 Applicable per Document Per amendement.
IMPORT OPERATIONS (LCL)
| Sr. No. | Particulars | Amount |
|---|---|---|
| 1. | LCL Storage Charges ( 1 Grid = 2 CBM) | 725 Per Grid |
| 2. | LCL Handling & Delivery charges Manual | Rs 5000 Per CBM |
| 3. | LCL Aggregation Charges | Rs. 500 Per cbm/ per MT (Whichever is higher) |
| 4. | Insurance charges Insurance charges |
2000 |
| 5. | Documentation charges | Rs. 2000 Per B/E |
| 6. | Cargo Segrregation & OT for Operations | Rs. 600 Per CBM |
| 7. | D. G. Cargo Handling Charges | Rs. 400 Per CBM/MT (Whichever is higher) |
| 8. | SSR Charges | Rs. 500 Per CBM/MT (Whichever is higher) |
| 9. | Package Weighing charges Heavy weight Pkgs ( 2.5MT to 10MT) Heavy weight Pkgs ( 10 to 15 MT) Heavy weight Pkgs ( 15 MT & above) |
Rs. 4900 Rs. 7400 Rs. 12450 |
Note
- Any heavy equipment above would be charged extra as per general tariff.
- DG Cargo / IMCO class will be charged double the normal tariff.
- All cheques / DD to be drawn in favour of “Supply Chain Logistics Private Limited” Payable at par at all branches.
- Prior to gate out of Cargo all CFS dues should be paid up front.
- Charges for HAZ / Reefer cargo 25% extra on Handling & storage on General Tariff.
- Amendment charges Rs. 200 Applicable per Document Per amendement.
- A Penalty of Rs.5,000/- per instrument will be levied for dishonor of Cheques irrespective of the reason for dishonour. Customers are requested to take extreme care and responsibility to honour the cheques to avoid inconvenience.
- Late Clearance charges (after 30 days) Rs. 1000/- for every 10 days.